Championship football club

Following the replacement of a (Championship) Football Stadium, Floodlighting system and the failure of the system operate as required, I was instructed by the Football Club to assist them in resolving the electrical technical anomalies of the floodlighting system (i.e. Alternative Dispute Resolution).

I initially requested copies of the electrical design and certification to review and ascertain whether the information was complete and compliant with the technical requirements. It was evident that the design and certification was incomplete and that the refurbishment of the floodlighting system had merely removed and replaced the existing floodlighting fittings.

Numerous meetings were held with the electrical contractor and eventually the whole system was operational and certified appropriately.

Client comment:

“I can confirm that we instructed Barry Kelly of B M Kelly and Associates Ltd to act as our Electrical Consultant after the replacement and upgrade (to an LED system) of our floodlighting system.

Mr Kelly was quickly able to review the inadequate documentation supplied by the electrical contractor, identify the technical requirements for such a system and specifically evidence where the electrical contractor had failed to satisfy the design and installation requirements.

Mr Kelly’s knowledge and experience were evident throughout and his ability to show and explain the requirements and failures directly to the parties was impressive.

We would have no hesitation to use or recommend the services offered by Mr Kelly.”