A number of electrical anomalies were identified within the electrical installation that were affecting the performance of the electrical lighting systems.

I was instructed to carry out a number of site visits to inspect aspects of the electrical installation to determine whether I could identify if any technical issues present. Any findings were to be included in the compilation of a number of expert reports.

The reports concluded that the electrical equipment had not been adequately installed i.e. not suitably protected from water ingress, which resulted in the failure of lighting systems.

Client comment:

“ZG Lighting UK Ltd instructed Barry Kelly to undertake various investigations at the Queensferry Crossing and submit a report on lighting products supplied and installed by others.

Barry swiftly undertook the works and provided ZG with a comprehensive report, in a timely fashion.

Barry’s knowledge and expertise and the quality of his work was superb throughout the instruction. The reports generated by Barry were conclusive and pivotal in resolution of disputes.

His communication with myself and other key internal stakeholders within ZG was exemplary and we have subsequently instructed Barry on further occasions to undertake works on behalf of ZG due his level of engagement, quality of work and Barry’s can-do attitude.

If the opportunity arises again in the future to utilise Barry’s services, we will certainly not hesitate to do so.”